Careful attention was required to ensure every nut, bolt, and washer was documented, numbered, and accounted for to ensure the dishes could be reassembled and utilised for the client at a future date. The project was completed over a period of three weeks with a majority of the work being carried out over the weekend to minimise disruption to the television studio.
NBN Newcastle




